From Legacy Systems to a Unified ERP
How a Multi-Generational Manufacturing Business Transformed Operations
A premium intimates manufacturer with a factory in China and sales in the US/EU was trapped between growth and operational chaos. Their China factory, sales team, and global logistics operated on disconnected systems (legacy ERP, spreadsheets, and basic sales/accounting tools). This fragmentation caused delayed order cycles, invisible inventory, and manual compliance risks.
I led the implementation of a cloud ERP built for China operations, integrated with US/EU sales and logistics systems in real time. The result was a 65% faster order-to-ship cycle, real-time global inventory visibility, and automated China-side tax compliance.
The Challenge
Manufacturer had the product quality and client relationships of a major player, but operated with fragmented tools:
-
System silos: Production in a legacy ERP, everything else in spreadsheets. Orders moved between systems via email.
-
Manual compliance: China-side tax compliance was managed via spreadsheets, causing delays and audit risks.
-
Invisible Inventory: Shipments between China and destinations were untracked leading to stock-outs or overstock.
-
Tribal Knowledge Bottlenecks: MOQ pricing, supplier contacts, fabric lead times existed only in WeChat and memory.
-
The delay: Sale quotes took 2-3 days due to email chains between sales and production checking stock and availability.
The Diagnosis
The core need was a single system to synchronize Suppliers ↔ Factory ↔ Global Warehouses ↔ Clients in real time.
The Solution
I project-managed the implementation of a China cloud-based ERP that delivered:
-
Instant Quote Engine – Real-time inventory + automated pricing cut quote time from 3 days to 15 minutes.
-
Automated Workflow – Sales now auto-generate production and purchase orders.
-
Unified Global Dashboard – Live visibility into factory stock, in-transit shipments, and destination inventory.
-
Supplier Portal – PO status, tech packs, and shipping docs tracked in one system, reducing email/WeChat exchanges by 80%.
-
Finance Sync – Automated reconciliation between global sales and China costing, reducing closing from weeks to days.
De-risked Approach
I served as the translator and single point of accountability between the client and the technology vendor, ensuring alignment:
-
Process Blueprinting – I mapped workflow before any software configuration.
-
Vendor Selection & Management – Ran the RFP and managed a fixed‑scope, milestone‑based implementation.
-
Data Migration Strategy – I prioritized migrating active products, clients, and suppliers; archived historical data for reporting.
-
Phased Go-Live – I ran pilot with the sales team first, then factory planning and production before any external rollout.
Project Timeline
A complete project from start to finish in 5 months:
-
Phase 1 – Strategic Blueprint (Weeks 1-3)
I translated operational pain into a fixed‑scope, milestone‑based plan. A de‑risked roadmap approved before build.
-
Phase 2 – Vendor Orchestration & Build (Weeks 4-12)
I managed vendor selection, design alignment, and implementation, delivering a fully configured system ready for launch.
-
Phase 3 – Staged Launch & Adoption (Weeks 13-17)
I led phased go-live and training across sales, factory, and suppliers, ensuring the system went live and fully owned by client.
-
Phase 4 – Outcome Validation & Handoff (Weeks 18-20)
I validated system performance against KPIs, delivered documentation, and hand off to the client with a validated foundation.
Quantifiable Outcomes
-
65% Faster Order Fulfillment – Order-to-ship cycle reduced from 21 to 7 days.
-
Real-Time Operational Visibility – One dashboard for leadership replaced daily manual reporting.
-
Error Reduction – Order entry/fulfillment errors decreased by an estimated 40%.
-
Supplier Communication – Email/WeChat follow-ups cut by over 80%.
Today, the manufacturer operates with real-time visibility, automated workflows, and a unified data foundation – bridging the gap between China operations and global sales. This transformation was delivered through a de‑risked, milestone‑driven partnership, where I acted as the single point of accountability from blueprint to go‑live.
Ready to streamline your own operations?
